Robust optimization for the cyclic hoist scheduling problem (Q300031): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q57185582, #quickstatements; #temporary_batch_1712261475387
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiobjective optimization. Interactive and evolutionary approaches / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line scheduling in a surface treatment system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cyclic hoist scheduling in large real-life electroplating lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new algorithm for generating all nondominated solutions of multiobjective discrete optimization problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved algorithm for cyclic flowshop scheduling in a robotic cell / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust scheduling on a single machine to minimize total flow time / rank
 
Normal rank
Property / cites work
 
Property / cites work: An evolutionary approach for the design and scheduling of electroplating facilities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two branch-and-bound algorithms for the robust parallel machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for robust schedules in a one-machine environment with ready times and due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-machine rescheduling heuristics with efficiency and stability as criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple augmented \(\epsilon\)-constraint method for multi-objective mathematical integer programming problems / rank
 
Normal rank

Revision as of 05:58, 12 July 2024

scientific article
Language Label Description Also known as
English
Robust optimization for the cyclic hoist scheduling problem
scientific article

    Statements

    Robust optimization for the cyclic hoist scheduling problem (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    23 June 2016
    0 references
    cyclic scheduling
    0 references
    hoist scheduling
    0 references
    robust scheduling
    0 references
    mixed integer linear programming
    0 references

    Identifiers