Uncertain flexible flow shop scheduling problem subject to breakdowns (Q5275883): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Two-machine ordered flowshop scheduling under random breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness / rank
 
Normal rank
Property / cites work
 
Property / cites work: An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with unexpected machine breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling two-stage hybrid flow shop with availability constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan on a single machine subject to random breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncertain random multilevel programming with application to production control problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Theory and practice of uncertain programming. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: OPTIMISTIC VALUE MODEL OF UNCERTAIN OPTIMAL CONTROL / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncertain differential equation with jumps / rank
 
Normal rank

Revision as of 02:48, 14 July 2024

scientific article; zbMATH DE number 6745558
Language Label Description Also known as
English
Uncertain flexible flow shop scheduling problem subject to breakdowns
scientific article; zbMATH DE number 6745558

    Statements

    Uncertain flexible flow shop scheduling problem subject to breakdowns (English)
    0 references
    0 references
    0 references
    14 July 2017
    0 references
    flexible flow shop scheduling
    0 references
    uncertain variable
    0 references
    machine breakdown
    0 references
    genetic algorithm
    0 references
    particle swarm optimization
    0 references

    Identifiers