Flow shop scheduling with flexible processing times (Q1621840): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Sequencing jobs on an automobile assembly line: objectives and procedures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing and scheduling in flowshops with task redistribution / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling research after five decades / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling three-operation jobs in a two-machine flow shop to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: General flow-shop scheduling with resource constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open shop scheduling with synchronization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-machine flow shop scheduling problem with controllable job processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of results for sequencing problems with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Three-Machine No-Wait Flow Shop is NP-Complete / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow shop-sequencing problem with synchronous transfers and makespan minimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity results for flow shop problems with synchronous movement / rank
 
Normal rank

Revision as of 07:29, 17 July 2024

scientific article
Language Label Description Also known as
English
Flow shop scheduling with flexible processing times
scientific article

    Statements

    Flow shop scheduling with flexible processing times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    12 November 2018
    0 references
    scheduling
    0 references
    flow shop
    0 references
    flexible processing times
    0 references
    processing time redistribution
    0 references

    Identifiers