The three-stage assembly flowshop scheduling problem (Q5939973): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/s0305-0548(00)00004-6 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1997353791 / rank | |||
Normal rank |
Revision as of 08:52, 30 July 2024
scientific article; zbMATH DE number 1623684
Language | Label | Description | Also known as |
---|---|---|---|
English | The three-stage assembly flowshop scheduling problem |
scientific article; zbMATH DE number 1623684 |
Statements
The three-stage assembly flowshop scheduling problem (English)
0 references
23 July 2001
0 references
approximation
0 references
heuristic
0 references
worst-case analysis
0 references