Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry (Q632662): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2010.10.013 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2010.10.013 / rank | |||
Normal rank |
Revision as of 05:41, 9 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry |
scientific article |
Statements
Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry (English)
0 references
25 March 2011
0 references
integrated planning and scheduling
0 references
mathematical programming
0 references
constraint programming
0 references
wood drying and finishing
0 references
anytime algorithm
0 references
lumber industry
0 references
0 references