Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (Q632667): Difference between revisions
From MaRDI portal
Normalize DOI. |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2010.10.018 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2010.10.018 / rank | |||
Normal rank |
Latest revision as of 23:08, 9 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Two-machine flowshop scheduling with intermediate transportation under job physical space consideration |
scientific article |
Statements
Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (English)
0 references
25 March 2011
0 references
coordinated scheduling
0 references
logistics
0 references
flowshop
0 references
worst-case analysis
0 references