A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (Q869149): Difference between revisions

From MaRDI portal
Created claim: DBLP publication ID (P1635): journals/eor/LuoC07, #quickstatements; #temporary_batch_1732530249250
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2005.06.069 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2005.06.069 / rank
 
Normal rank

Latest revision as of 06:10, 10 December 2024

scientific article
Language Label Description Also known as
English
A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness
scientific article

    Statements

    A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (English)
    0 references
    0 references
    0 references
    26 February 2007
    0 references
    combinatorial optimization
    0 references
    maximum tardiness
    0 references
    sequence-dependent setup
    0 references
    branch and bound
    0 references
    single machine schedule
    0 references

    Identifiers