A projective algorithm for preemptive open shop scheduling with two multiprocessor groups (Q969520): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.orl.2009.10.007 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.ORL.2009.10.007 / rank
 
Normal rank

Latest revision as of 10:34, 10 December 2024

scientific article
Language Label Description Also known as
English
A projective algorithm for preemptive open shop scheduling with two multiprocessor groups
scientific article

    Statements

    A projective algorithm for preemptive open shop scheduling with two multiprocessor groups (English)
    0 references
    0 references
    0 references
    0 references
    7 May 2010
    0 references
    preemptive open shop scheduling
    0 references
    multiprocessor operations
    0 references
    linear programming
    0 references

    Identifiers