A combined column generation and heuristics for railway short-term rolling stock planning with regular inspection constraints (Q1652213): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2016.11.025 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2016.11.025 / rank | |||
Normal rank |
Latest revision as of 02:02, 11 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A combined column generation and heuristics for railway short-term rolling stock planning with regular inspection constraints |
scientific article |
Statements
A combined column generation and heuristics for railway short-term rolling stock planning with regular inspection constraints (English)
0 references
11 July 2018
0 references
combinatorial optimization
0 references
scheduling
0 references
rolling stock planning
0 references
column generation
0 references
set partitioning problem
0 references
Lagrangian relaxation
0 references
heuristics
0 references
0 references