Solving integrated process planning and scheduling problem with constructive meta-heuristics (Q1671703): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.ins.2016.01.001 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.INS.2016.01.001 / rank | |||
Normal rank |
Latest revision as of 02:21, 11 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Solving integrated process planning and scheduling problem with constructive meta-heuristics |
scientific article |
Statements
Solving integrated process planning and scheduling problem with constructive meta-heuristics (English)
0 references
7 September 2018
0 references
jobshop scheduling
0 references
process planning
0 references
constructive meta-heuristics
0 references
ant colony optimization
0 references
0 references
0 references
0 references
0 references
0 references
0 references