An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times (Q1761212): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2012.01.011 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2012.01.011 / rank | |||
Normal rank |
Latest revision as of 09:02, 11 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times |
scientific article |
Statements
An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times (English)
0 references
15 November 2012
0 references
scheduling
0 references
sequencing
0 references
heuristic
0 references
simulation
0 references
optimality
0 references
optimality rate
0 references
0 references
0 references
0 references
0 references
0 references
0 references