An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times (Q1761212): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2012.01.011 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2012.01.011 / rank
 
Normal rank

Latest revision as of 09:02, 11 December 2024

scientific article
Language Label Description Also known as
English
An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times
scientific article

    Statements

    An empirical analysis of heuristics for solving the two-machine flow shop problem with job release times (English)
    0 references
    0 references
    0 references
    15 November 2012
    0 references
    scheduling
    0 references
    sequencing
    0 references
    heuristic
    0 references
    simulation
    0 references
    optimality
    0 references
    optimality rate
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers