Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2007.12.042 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2007.12.042 / rank
 
Normal rank

Latest revision as of 08:11, 18 December 2024

scientific article
Language Label Description Also known as
English
Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times
scientific article

    Statements

    Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (English)
    0 references
    0 references
    0 references
    8 January 2009
    0 references
    scheduling
    0 references
    job shop
    0 references
    sequence dependent setup
    0 references
    dispatching rules
    0 references
    genetic algorithms
    0 references

    Identifiers