Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.ejor.2007.12.042 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.EJOR.2007.12.042 / rank | |||
Normal rank |
Latest revision as of 08:11, 18 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times |
scientific article |
Statements
Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (English)
0 references
8 January 2009
0 references
scheduling
0 references
job shop
0 references
sequence dependent setup
0 references
dispatching rules
0 references
genetic algorithms
0 references
0 references
0 references
0 references