Pages that link to "Item:Q2256205"
From MaRDI portal
The following pages link to A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems (Q2256205):
Displayed 7 items.
- Two-agent single-machine scheduling with release dates to minimize the makespan (Q6081603) (← links)
- Two-agent single-machine scheduling with a rate-modifying activity (Q6087481) (← links)
- An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain (Q6091879) (← links)
- Single-machine preemptive scheduling with release dates involving the total weighted late work criterion (Q6093999) (← links)
- Competitive two-agent scheduling with release dates and preemption on a single machine (Q6116025) (← links)
- Single-machine scheduling of multiple projects with controllable processing times (Q6167669) (← links)
- Algorithms for two-agent unbounded serial-batch scheduling with makespan and maximum lateness objectives (Q6186161) (← links)