The following pages link to Computers \& Operations Research (Q162215):
Displaying 50 items.
- Integrating reliability and quality of service in networks with switched virtual circuits (Q1886726) (← links)
- Cost-optimal topology planning of hierarchical access networks (Q1886727) (← links)
- Constrained abductive reasoning with fuzzy parameters in Bayesian networks (Q1886729) (← links)
- Simulated annealing heuristics for managing resources during planned outages at electric power plants (Q1886731) (← links)
- An empirical study of policy convergence in Markov decision process value iteration (Q1886733) (← links)
- Generating optimal T-shape cutting patterns for circular blanks (Q1886734) (← links)
- Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis (Q1886736) (← links)
- Optimized planning of frequency hopping in cellular networks (Q1886738) (← links)
- Estimation of software reliability with execution time model using the pattern mapping technique of artificial neural network (Q1886740) (← links)
- An analysis of lower bound procedures for the bin packing problem (Q1886845) (← links)
- A compact model and tight bounds for a combined location-routing problem (Q1886846) (← links)
- An \(\varepsilon\)-accurate model for optimal unequal-area block layout design (Q1886847) (← links)
- Performance analysis of a kitting process in stochastic assembly systems (Q1886849) (← links)
- Embedded local search approaches for routing optimization (Q1886851) (← links)
- A 0-1 goal programming model for nurse scheduling (Q1886852) (← links)
- An algorithm for ranking quickest simple paths (Q1886854) (← links)
- Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs (Q1886856) (← links)
- A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers (Q1886858) (← links)
- Improved heuristics for the early/tardy scheduling problem with no idle time (Q1886859) (← links)
- Finding \(K\) shortest looping paths in a traffic-light network (Q1886860) (← links)
- An ant algorithm for the single row layout problem in flexible manufacturing systems (Q1886861) (← links)
- Total completion time minimization in a computer system with a server and two parallel processors (Q1886864) (← links)
- Reliable and economic resource allocation in an unreliable flow network (Q1886865) (← links)
- Processor-shared service systems with queue-dependent processors (Q1886866) (← links)
- Flow-shop scheduling for three serial stations with the last two duplicate (Q1886869) (← links)
- A new repair-replace strategy for items sold with a two-dimensional warranty (Q1886871) (← links)
- Machine scheduling with earliness, tardiness and non-execution penalties (Q1886873) (← links)
- Information transformation in a supply chain: a simulation study (Q1886874) (← links)
- A review: The arrangement increasing partial ordering (Q1890964) (← links)
- The distribution of total variation distance, with applications to simultaneous confidence intervals (Q1890965) (← links)
- Expected cost comparisons for inspection and repair policies (Q1890966) (← links)
- Discrete hazard rate functions (Q1890968) (← links)
- Acceptable quality level versus zero-defects: Some empirical evidence (Q1890969) (← links)
- Statistical analysis of deadband-deviation rules in quality control (Q1890970) (← links)
- Inspection, maintenance and replacement models (Q1890971) (← links)
- Tests for special causes with multivariate autocorrelated data (Q1890973) (← links)
- Measures of component importance in reliability theory (Q1890974) (← links)
- Multiple criteria decision making: The case for interdependence (Q1891234) (← links)
- Heuristics for operator scheduling in group technology cells (Q1891236) (← links)
- A heuristic for parallel machine scheduling with agreeable due dates to minimize the number of late jobs (Q1891237) (← links)
- Cascading-heuristics for the solution of staircase linear programs (Q1891238) (← links)
- Flow-shop scheduling with flexible processors (Q1891241) (← links)
- A backward approach in list scheduling algorithms for multi-machine tardiness problems (Q1891242) (← links)
- An efficient pruning algorithm for value independent knapsack problem using a DAG structure (Q1891244) (← links)
- An optimization modeling for customer redistribution and its spreadsheet implementation (Q1891246) (← links)
- A deterministic lot-size inventory model for deteriorating items with shortages and a declining market (Q1891247) (← links)
- Joint investment in quality improvement and setup reduction (Q1892664) (← links)
- Immune network memory: An inventory approach (Q1892665) (← links)
- Solving transportation problems with nonlinear side constraints with tabu search (Q1892666) (← links)
- Improving the performance of enumerative search methods. I: Exploiting structure and intelligence (Q1892667) (← links)