Pages that link to "Item:Q319438"
From MaRDI portal
The following pages link to A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438):
Displaying 26 items.
- Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards (Q2362173) (← links)
- Minimum cost noncrossing flow problem on layered networks (Q2414449) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- Novel formulations and modeling enhancements for the dynamic berth allocation problem (Q2424775) (← links)
- Integrated truck and workforce scheduling to accelerate the unloading of trucks (Q2424789) (← links)
- Berth assignment for liner carrier clusters under a cooperative environment (Q2669590) (← links)
- Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems (Q2669757) (← links)
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination (Q2691472) (← links)
- On the Berth Allocation Problem (Q2826660) (← links)
- A Decision Model for Berth Allocation Under Uncertainty Considering Service Level Using an Adaptive Differential Evolution Algorithm (Q2956871) (← links)
- On minimizing dataset transfer time in an acyclic network with four servers (Q2959189) (← links)
- New Lower Bound and Exact Method for the Continuous Berth Allocation Problem (Q4971379) (← links)
- Metaheuristic approaches for the Berth Allocation Problem (Q4987695) (← links)
- Vehicle Sequencing at Transshipment Terminals with Handover Relations (Q4995083) (← links)
- Vessel Service Planning in Seaports (Q5106352) (← links)
- An improved genetic algorithm for the berth scheduling with ship-to-ship transshipment operations integrated model (Q6065602) (← links)
- Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II (Q6090473) (← links)
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity (Q6109309) (← links)
- Simultaneous operation of next-generation and traditional quay cranes at container terminals (Q6112695) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Robust optimization for the integrated berth allocation and quay crane assignment problem (Q6130707) (← links)
- Quay partitioning problem (Q6146630) (← links)
- Improved sequential insertion heuristics for berth allocation problems (Q6146631) (← links)
- Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem (Q6164375) (← links)
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition (Q6164635) (← links)
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model (Q6187236) (← links)