The following pages link to Reza Tavakkoli-Moghaddam (Q278365):
Displayed 50 items.
- Modified particle swarm optimization in a time-dependent vehicle routing problem: minimizing fuel consumption (Q2361135) (← links)
- A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products (Q2391231) (← links)
- Solving multi-objective optimization formulation for fleet planning in a railway industry (Q2430600) (← links)
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness (Q2456478) (← links)
- A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert (Q2490218) (← links)
- A hybrid simulated annealing for capacitated vehicle routing problems with the independent route length (Q2495966) (← links)
- Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert (Q2570803) (← links)
- A hybrid method for solving stochastic job shop scheduling problems (Q2572011) (← links)
- Solving a dynamic cell formation problem using metaheuristics (Q2573543) (← links)
- A multi-objective fuzzy goal programming model for reverse supply chain design (Q2627461) (← links)
- A multi-modal competitive hub location pricing problem with customer loyalty and elastic demand (Q2664382) (← links)
- Competitive facility location problem with foresight considering discrete-nature attractiveness for facilities: model and solution (Q2676299) (← links)
- Dynamic routing-scheduling problem for home health care considering caregiver-patient compatibility (Q2676402) (← links)
- An MCDA-DEA approach for mixed-model assembly line balancing problem under uncertainty (Q2987966) (← links)
- A New Hybrid Multi-objective Pareto Archive PSO Algorithm for a Classic Job Shop Scheduling Problem with Ready Times (Q3053333) (← links)
- Multi-objective Particle Swarm Optimization for Sequencing and Scheduling a Cellular Manufacturing System (Q3053335) (← links)
- A fuzzy grey model based on the compromise ranking for multi-criteria group decision making problems in manufacturing systems (Q3190304) (← links)
- An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart (Q3389672) (← links)
- (Q3410352) (← links)
- (Q3631215) (← links)
- (Q4463374) (← links)
- A discrete-time approximation technique for the time-cost trade-off in PERT networks (Q4600613) (← links)
- (Q4976119) (← links)
- Measuring the Efficiency of Banks' Performance Based on Economic Policies Using Data Envelopment Analysis (Q5052632) (← links)
- Mathematical modeling of a bi-objective hub location-routing problem for rapid transit networks (Q5053908) (← links)
- Solving a new robust green cellular manufacturing problem with environmental issues under uncertainty using Benders decomposition (Q5059189) (← links)
- Designing a model for service facility protection with a time horizon based on tri-level programming (Q5059288) (← links)
- Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm (Q5059407) (← links)
- New definition of the cross entropy based on the Dempster-Shafer theory and its application in a decision-making process (Q5085620) (← links)
- Designing a Hybrid Model of Data Envelopment Analysis with Taguchi Approach to Optimize Multiple Response Banks Performance (Q5095387) (← links)
- Modelling and solving the bi-objective production–transportation problem with time windows and social sustainability (Q5098824) (← links)
- (Q5151741) (← links)
- Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis (Q5172234) (← links)
- An interactive possibilistic programming approach for a multi-objective closed-loop supply chain network under uncertainty (Q5172559) (← links)
- A new method for trapezoidal fuzzy numbers ranking based on the Shadow length and its application to manager's risk taking (Q5176811) (← links)
- Lead time and ordering cost reductions in budget and storage space restricted probabilistic inventory models with imperfect items (Q5247687) (← links)
- Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach (Q5387379) (← links)
- A new solution for a dynamic cell formation problem with alternative routing and machine costs using simulated annealing (Q5387380) (← links)
- Mixed-Model Assembly Line Sequencing Using Real Options (Q5391755) (← links)
- A New Approach for Mixed-Model Assembly Line Sequencing (Q5391756) (← links)
- A Multi-Objective Particle Swarm for a Mixed-Model Assembly Line Sequencing (Q5391758) (← links)
- (Q5431790) (← links)
- (Q5453769) (← links)
- Stochastic Algorithms: Foundations and Applications (Q5493368) (← links)
- (Q5719032) (← links)
- (Q5852550) (← links)
- An extended ϵ‐constraint method for a multiobjective finite‐horizon Markov decision process (Q6060650) (← links)
- A combinatorial auction‐based approach for ridesharing in a student transportation system (Q6065826) (← links)
- Pricing decisions in a multiechelon supply chain under a bundling strategy (Q6066640) (← links)
- A chance-constraint optimization model for a multi-echelon multi-product closed-loop supply chain considering brand diversity: an accelerated Benders decomposition algorithm (Q6109344) (← links)