Pages that link to "Item:Q621683"
From MaRDI portal
The following pages link to Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683):
Displaying 19 items.
- Scheduling interrelated activities in complex projects under high-order rework: a DSM-based approach (Q2668674) (← links)
- Impacts of synergies on software project scheduling (Q2673811) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates (Q3188762) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations (Q3458826) (← links)
- Scheduling aspects in keyword extraction problem (Q4642112) (← links)
- Activities planning and resources assignment on distinct places: a mathematical model (Q5247672) (← links)
- Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource (Q6065637) (← links)
- Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison (Q6088125) (← links)
- Local search approaches for the test laboratory scheduling problem with variable task grouping (Q6090219) (← links)
- The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights (Q6090500) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Single-machine scheduling of multiple projects with controllable processing times (Q6167669) (← links)
- Exact algorithms for a parallel machine scheduling problem with workforce and contiguity constraints (Q6551087) (← links)
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective (Q6588462) (← links)
- Resource overload problems with tardiness penalty: structural properties and solution approaches (Q6588471) (← links)
- Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling (Q6657888) (← links)