The following pages link to Stéphane Dauzère-Pérès (Q309047):
Displaying 19 items.
- Just-in-Time Planning and Lot-Sizing (Q2958674) (← links)
- Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales (Q2997889) (← links)
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows (Q3392030) (← links)
- Lot Streaming in Job-Shop Scheduling (Q4363760) (← links)
- Routing Trains Through Railway Stations: Model Formulation and Algorithms (Q4364995) (← links)
- Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine (Q4432721) (← links)
- On the importance of sequencing decisions in production planning and scheduling (Q4468896) (← links)
- A modified shifting bottleneck procedure for job-shop scheduling (Q4696979) (← links)
- (Q4874536) (← links)
- Single-machine scheduling with time window-dependent processing times (Q5200784) (← links)
- Flexible job-shop scheduling with transportation resources (Q6087485) (← links)
- A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems (Q6096569) (← links)
- An improved decision support model for scheduling production in an engineer-to-order manufacturer (Q6097850) (← links)
- Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem (Q6106559) (← links)
- Minimizing the sum of completion times on a single machine with health index and flexible maintenance operations (Q6109303) (← links)
- Energy cost efficient scheduling in flexible job-shop manufacturing systems (Q6113446) (← links)
- The flexible job shop scheduling problem: a review (Q6128932) (← links)
- A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness (Q6164626) (← links)
- Parallel Machine Scheduling with a Single Resource per Job (Q6306685) (← links)