Pages that link to "Item:Q4032492"
From MaRDI portal
The following pages link to A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (Q4032492):
Displaying 50 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (Q309061) (← links)
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization (Q473573) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Scheduling and constraint propagation (Q697570) (← links)
- Jackson's pseudo-preemptive schedule and cumulative scheduling problems (Q705501) (← links)
- Activity consolidation to improve responsiveness (Q706959) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- Complexity of the scheduling language RSV (Q815986) (← links)
- A classification of predictive-reactive project scheduling procedures (Q835548) (← links)
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (Q835585) (← links)
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (Q872245) (← links)
- A new search procedure for the two-dimensional orthogonal packing problem (Q894552) (← links)
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements (Q924628) (← links)
- Solving the resource-constrained project scheduling problem using filter-and-fan approach (Q945251) (← links)
- A random generator of resource-constrained multi-project network problems (Q964864) (← links)
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem (Q994252) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- Scheduling of design projects with uncertain number of iterations (Q1124816) (← links)
- A comparison of stochastic scheduling rules for maximizing project net present value (Q1127130) (← links)
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (Q1129955) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Two branch and bound algorithms for the permutation flow shop problem (Q1266538) (← links)
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (Q1266547) (← links)
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem (Q1266548) (← links)
- Modelling setup times, process batches and transfer batches using activity network logic (Q1266699) (← links)
- A multiple-tree search procedure for the resource-constrained project scheduling problem (Q1266726) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- A genetic algorithm for multi-mode resource constrained project scheduling problem (Q1278080) (← links)
- On the use of the complexity index as a measure of complexity in activity networks (Q1278225) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- Ensuring quality in resource constrained project scheduling (Q1280181) (← links)
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (Q1291582) (← links)
- The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure (Q1296080) (← links)
- A branch and bound algorithm for the resource-constrained project scheduling problem (Q1296084) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- Optimization analysis for design and planning of multi-project programs (Q1296112) (← links)
- An exact depth-first algorithm for the pallet loading problem (Q1303552) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs (Q1307810) (← links)