The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness (Q2627801)

From MaRDI portal
Revision as of 21:41, 13 February 2024 by RedirectionBot (talk | contribs) (‎Changed an Item)
scientific article
Language Label Description Also known as
English
The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness
scientific article

    Statements

    The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness (English)
    0 references
    0 references
    0 references
    31 May 2017
    0 references
    Summary: In this paper, we investigate the problem of n-jobs scheduling in an m-machine permutation flowshop with exact time lags between consecutive operations of each job. The exact time lag is defined as the time elapsed between every couple of successive operations of the same job which is equal to a prescribed value. The aim is to find a feasible schedule that minimises the total tardiness and earliness. We propose three mathematical formulations, which are then solved by running the commercial software CPLEX to provide an optimal solution for small size problems. As the problem is shown to be strongly NP-hard, we propose new improved upper and lower bounds useful for large size problems. We then evaluate their effectiveness through an extensive computational experiment.
    0 references
    permutation flowshops
    0 references
    flowshop scheduling
    0 references
    exact time lags
    0 references
    tardiness
    0 references
    earliness
    0 references
    mathematical formulations
    0 references
    lower bounds
    0 references
    upper bounds
    0 references

    Identifiers