The following pages link to Mario Vanhoucke (Q213373):
Displaying 20 items.
- Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach (Q2668695) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- New summary measures and datasets for the multi-project scheduling problem (Q2670516) (← links)
- (Q2923180) (← links)
- A finite-capacity production scheduling procedure for a Belgian steel company (Q3012635) (← links)
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (Q3114719) (← links)
- New computational results on the discrete time/cost trade-off problem in project networks (Q3157790) (← links)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363) (← links)
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (Q3392089) (← links)
- A simulation and evaluation of earned value metrics to forecast the project duration (Q3512386) (← links)
- Scheduling an R&D Project with Quality-Dependent Time Slots (Q3600140) (← links)
- Discrete time/cost trade-offs in project scheduling with time-switch constraints (Q4656679) (← links)
- Maximizing the net present value of a project with linear time-dependent cash flows (Q4679968) (← links)
- A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem (Q5870371) (← links)
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem (Q5948200) (← links)
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem (Q6106485) (← links)
- On the complexity of efficient multi-skilled team composition (Q6106584) (← links)
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (Q6106961) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)