Publication | Date of Publication | Type |
---|
A Multiobjective Branch-and-Bound Framework: Application to the Biobjective Spanning Tree Problem | 2012-07-28 | Paper |
New Exact Algorithms for One-Machine Earliness-Tardiness Scheduling | 2012-07-28 | Paper |
The Continuous Assignment Problem and Its Application to Preemptive and Non-Preemptive Scheduling with Irregular Cost Functions | 2012-06-08 | Paper |
Multiple-Machine Lower Bounds for Shop-Scheduling Problems | 2012-05-30 | Paper |
On maximizing the profit of a satellite launcher: selecting and scheduling tasks with time windows and setups | 2010-04-28 | Paper |
Fast neighborhood search for the single machine earliness-tardiness scheduling problem | 2010-03-19 | Paper |
Lexicographically minimizing axial motions for the Euclidean TSP | 2010-03-09 | Paper |
A DFO technique to calibrate queueing models | 2009-10-15 | Paper |
A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem | 2009-08-28 | Paper |
Single machine scheduling with forbidden start times | 2009-06-22 | Paper |
The one-machine just-in-time scheduling problem with preemption | 2009-04-17 | Paper |
A new model for the preemptive earliness-tardiness scheduling problem | 2009-04-17 | Paper |
Scheduling with periodic availability constraints and irregular cost functions | 2009-02-03 | Paper |
https://portal.mardi4nfdi.de/entity/Q3598877 | 2009-02-03 | Paper |
Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date | 2008-10-08 | Paper |
Search tree based approaches for parallel machine scheduling | 2008-09-01 | Paper |
Biclique completion problems for multicast network design | 2008-05-14 | Paper |
Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates | 2008-04-24 | Paper |
Dynasearch for the earliness-tardiness scheduling problem with release dates and setup constraints | 2008-03-28 | Paper |
The one-machine problem with earliness and tardiness penalties | 2007-12-20 | Paper |
Exponential neighborhood search for a parallel machine scheduling problem | 2007-11-06 | Paper |
Lagrangian bounds for just-in-time job-shop scheduling | 2007-10-19 | Paper |
Memory management optimization problems for integrated circuit simulators | 2007-09-19 | Paper |
https://portal.mardi4nfdi.de/entity/Q5755520 | 2007-08-13 | Paper |
The complexity of mean flow time scheduling problems with release times | 2007-05-15 | Paper |
An improved earliness--tardiness timing algorithm | 2007-04-26 | Paper |
Efficient neighborhood search for the one-machine earliness-tardiness scheduling problem | 2006-05-29 | Paper |
Punctuality and idleness in just-in-time scheduling | 2005-09-28 | Paper |
Optimal timing of a sequence of tasks with general completion costs | 2005-05-12 | Paper |
Earliness-tardiness scheduling with setup considerations | 2005-05-12 | Paper |
Continuous filling and emptying of storage systems in constraint-based scheduling | 2005-04-21 | Paper |
Scheduling chains on a single machine with non-negative time lags | 2003-06-26 | Paper |
PERT scheduling with convex cost functions. | 2003-01-22 | Paper |
Fiber-to-object assignment heuristics | 2002-11-17 | Paper |
Preemptive scheduling with two minimax criteria | 2002-06-09 | Paper |
Scheduling with tails and deadlines | 2001-07-12 | Paper |
Scheduling tasks on unrelated machines: large neighborhood improvement procedures | 2001-01-01 | Paper |