An optimal tool selection procedure for the initial design phase of a flexible manufacturing system

From MaRDI portal
Revision as of 00:12, 30 January 2024 by Import240129110155 (talk | contribs) (Created automatically from import240129110155)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1183619

DOI10.1016/0377-2217(91)90224-JzbMath0742.90035OpenAlexW2070798604MaRDI QIDQ1183619

Panagiotis Kouvelis

Publication date: 28 June 1992

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(91)90224-j




Related Items (6)




Cites Work




This page was built for publication: An optimal tool selection procedure for the initial design phase of a flexible manufacturing system