Spare parts inventory control under system availability constraints

From MaRDI portal
Revision as of 07:25, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:514374


DOI10.1007/978-1-4899-7609-3zbMath1356.90009MaRDI QIDQ514374

Bram Kranenburg, Geert-Jan van Houtum

Publication date: 1 March 2017

Published in: International Series in Operations Research \& Management Science (Search for Journal in Brave)

Full work available at URL: https://research.tue.nl/nl/publications/5dce7f53-49d0-4540-b5b0-c1ebfad61527


90B06: Transportation, logistics and supply chain management

90B05: Inventory, storage, reservoirs

90-02: Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming


Related Items

Probabilistic resource pooling games, Optimal control policies for an inventory system with commitment lead time, Pooling of spare parts between multiple users: how to share the benefits?, A new partial pooling structure for spare parts networks, Traditional or additive manufacturing? Assessing component design options through lifecycle cost analysis, A survey of maintenance and service logistics management: classification and research agenda from a maritime sector perspective, Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems, Transshipment policies for systems with multiple retailers and two demand classes, A multi-item approach to repairable stocking and expediting in a fluctuating demand environment, Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures, Joint condition-based maintenance and inventory optimization for systems with multiple components, Integrated planning of spare parts and service engineers with partial backlogging, Integrated location and inventory planning in service parts logistics with customer-based service levels, A review of operational spare parts service logistics in service control towers, A sorting based efficient heuristic for pooled repair shop designs, Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions, Contract design for equipment after-sales service with business interruption insurance, Optimal allocation policy for a multi-location inventory system with a quick response warehouse, Operational planning in service control towers -- heuristics and case study