Due-window assignment and scheduling with multiple rate-modifying activities under the effects of deterioration and learning
From MaRDI portal
Publication:541440
DOI10.1155/2011/151563zbMath1213.90095WikidataQ58692707 ScholiaQ58692707MaRDI QIDQ541440
Zhanguo Zhu, Lin-Yan Sun, Feng Chu, Ming Liu
Publication date: 7 June 2011
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/231981
90B22: Queues and service in operations research
Related Items
Two-agent single-machine scheduling of jobs with time-dependent processing times and ready times, Single-machine group scheduling problems with deterioration to minimize the sum of completion times, Improved algorithms for single-machine common due window assignment and scheduling with batch deliveries
Cites Work
- Unnamed Item
- Unnamed Item
- Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities
- Scheduling with job-dependent learning effects and multiple rate-modifying activities
- Single-machine and two-machine flowshop scheduling with general learning functions
- Scheduling deteriorating jobs subject to job or machine availability constraints
- Scheduling a maintenance activity and due-window assignment on a single machine
- Two-parallel machines scheduling with rate-modifying activities to minimize total completion time
- A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration
- Single-machine scheduling with learning considerations
- Scheduling jobs under simple linear deterioration
- Complexity analysis of job-shop scheduling with deteriorating jobs
- Machine scheduling with a rate-modifying activity
- A survey of the state-of-the-art of common due date assignment and scheduling research
- A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity
- Scheduling with general job-dependent learning curves.
- Common due date scheduling with autonomous and induced learning
- A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
- Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance
- Parallel-machine scheduling with simple linear deterioration to minimize total completion time
- Single-machine group scheduling with a time-dependent learning effect
- Common due window size and location determination in a single machine scheduling problem
- SCHEDULING PROBLEMS WITH THE EFFECTS OF DETERIORATION AND LEARNING
- Scheduling Deteriorating Jobs on a Single Processor
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling start time dependent jobs to minimize the total weighted completion time
- Λ-Shaped Policies to Schedule Deteriorating Jobs
- Single machine scheduling with learning effect considerations