Optimal number of minimal repairs before ordering spare for preventive replacement
From MaRDI portal
Publication:611598
DOI10.1016/j.apm.2010.02.033zbMath1201.90009MaRDI QIDQ611598
Publication date: 14 December 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2010.02.033
90B05: Inventory, storage, reservoirs
Related Items
Optimal order-replacement policy for a phase-type geometric process model with extreme shocks, The ordering and replacement policy for the system with two types of failures, Age replacement policy with lead-time for a system subject to non-homogeneous pure birth shocks, An optimal number-dependent preventive maintenance strategy for offshore wind turbine blades considering logistics, Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures, Optimal maintenance strategy under renewable warranty with repair time threshold, Joint optimization of maintenance, buffer, and spare parts for a production system, Cost models for age replacement policies and block replacement policies under warranty, A new generalized burn-in procedure for items in stochastically evolving population, Mathematical modeling and performance analysis of machine repairable system with hot spares, A geometric process model forM/PH(M/PH)/1/Kqueue with new service machine procurement lead time
Cites Work
- A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
- Optimal spare ordering policy for preventive replacement under cost effectiveness criterion
- Generalized spare ordering policies with random lead time
- A survey of maintenance policies of deteriorating systems
- Optimal spare ordering policy under a rebate warranty
- An ordering policy with lead time
- On the optimal ordering policies in maintenance theory—survey and applications
- Generalized spare ordering policies with allowable inventory time