CUSUM charts for monitoring the mean of a multivariate Gaussian process
From MaRDI portal
Publication:630935
DOI10.1016/j.jspi.2010.12.020zbMath1209.62375OpenAlexW2055701391MaRDI QIDQ630935
Publication date: 22 March 2011
Published in: Journal of Statistical Planning and Inference (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.jspi.2010.12.020
tablesstatistical process controllikelihood ratio approachsequential probability ratio testmultivariate control charts
Applications of statistics in engineering and industry; control charts (62P30) Inference from stochastic processes (62M99) Sequential statistical analysis (62L10)
Related Items
Statistical surveillance of the mean vector and the covariance matrix of nonlinear time series ⋮ Control charts for multivariate spatial autoregressive models ⋮ Sequential monitoring of high‐dimensional time series ⋮ Joint optimisation of double warning T2-Hotelling chart and maintenance policy with multiple assignable causes ⋮ Control charts for high-dimensional time series with estimated in-control parameters ⋮ Monitoring mean changes in persistent multivariate time series ⋮ Recent advances in shrinkage-based high-dimensional inference ⋮ Surveillance of non-stationary processes
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Sequential analysis. Tests and confidence intervals
- Approximations to the expected sample size of certain sequential tests
- CUSUM control schemes for Gaussian processes
- The influence of parameter estimation on the ARL of Shewhart type charts for time series
- Using the generalized likelihood ratio statistic for sequential detection of a change-point
- Likelihood Ratio Identities and Their Applications to Sequential Analysis
- Multivariate Generalizations of Cumulative Sum Quality-Control Schemes
- A Multivariate Exponentially Weighted Moving Average Control Chart
- One‐sided mewama control charts
- Run-Length Distributions of Special-Cause Control Charts for Correlated Processes
- Ewma charts for multivariate time series
- Are estimated control charts in control?
- CONTINUOUS INSPECTION SCHEMES