Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes
From MaRDI portal
Publication:693407
DOI10.1016/j.apm.2011.09.061zbMath1252.90022OpenAlexW2026422974MaRDI QIDQ693407
Bo Chen, Ba-Yi Cheng, Xiao-xuan Hu, Shan-Lin Yang
Publication date: 7 December 2012
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2011.09.061
Related Items (14)
A branch and bound based heuristic for makespan minimization of washing operations in hospital sterilization services ⋮ Effective heuristics for makespan minimization in parallel batch machines with non-identical capacities and job release times ⋮ Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times ⋮ A reinforcement learning iterated local search for makespan minimization in additive manufacturing machine scheduling problems ⋮ A bi-objective branch-and-bound algorithm for the unit-time job shop scheduling: a mixed graph coloring approach ⋮ Scheduling jobs with sizes and delivery times on identical parallel batch machines ⋮ Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems ⋮ Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes ⋮ Uniform parallel machine scheduling with resource consumption constraint ⋮ Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration ⋮ A note on the algorithm LPT-FF for a flowshop scheduling with two batch-processing machines ⋮ Parallel machine scheduling with tool loading ⋮ Ant colony optimization algorithm for total weighted completion time minimization on non-identical batch machines ⋮ Batch scheduling of nonidentical job sizes with minsum criteria
Cites Work
- Minimizing number of tardy jobs on a batch processing machine with incompatible job families
- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach
- A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
- A branch and price algorithm to minimize makespan on a single batch processing machine with non-identical job sizes
- A note on minimizing makespan on a single batch processing machine with nonidentical job sizes
- Genetic algorithms to minimize the weighted number of late jobs on a single machine.
- Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
- Minimizing makespan on a single batching machine with release times and non-identical job sizes
- Minimizing makespan on a single batch processing machine with nonidentical job sizes
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling a single batch processing machine with non-identical job sizes
- Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes
- Minimizing the makespan on a batch machine with non-identical job sizes: An exact procedure
This page was built for publication: Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes