Multi-echelon supply chain inventory planning with demand and leadtime uncertainty (Q840591)

From MaRDI portal
Revision as of 14:04, 30 January 2024 by Import240129110113 (talk | contribs) (Added link to MaRDI item.)
scientific article
Language Label Description Also known as
English
Multi-echelon supply chain inventory planning with demand and leadtime uncertainty
scientific article

    Statements

    Multi-echelon supply chain inventory planning with demand and leadtime uncertainty (English)
    0 references
    13 September 2009
    0 references
    Summary: The paper discusses a generic model for multi-echelon supply chain inventory planning (MSCIP) with demand and leadtime uncertanity considering the total supply chain (TSC) cost, which consists of supply chain inventory capital (SCIC), supply chain ordering/set-up cost (SCOC) and supply chain stock-out cost (SCSC) for a maximum allowable supply chain inventory (MASCI). The differential evolution (DE/best/1/bin) strategy is used to solve the MSCIP problem to determine ordering/production quantity and service level that should be maintained by each member of the supply chain. One case situation is elucidated to reinforce the salient features of the concept. A sensitivity analysis is carried out to know how the TSC is varying along MASCI in different environments.
    0 references
    differential evolution strategy
    0 references
    supply chain inventory
    0 references
    supply chain management (SCM)
    0 references
    inventory planning
    0 references
    demand uncertainty
    0 references
    lead time uncertainty
    0 references

    Identifiers