A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation
From MaRDI portal
Publication:877611
DOI10.1016/j.ejor.2005.10.070zbMath1123.90055OpenAlexW2092192562MaRDI QIDQ877611
Publication date: 3 May 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.10.070
Large-scale problems in mathematical programming (90C06) Quadratic programming (90C20) Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Medium-term power planning in electricity markets with pool and bilateral contracts ⋮ Warmstarting for interior point methods applied to the long-term power planning problem
Uses Software
Cites Work
This page was built for publication: A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation