A scheduling problem with unrelated parallel machines and sequence dependent setups
From MaRDI portal
Publication:973463
DOI10.1504/IJOR.2007.014169zbMath1187.90142MaRDI QIDQ973463
Martín Gómez Ravetti, Geraldo Robson Mateus, Pedro Leite Rocha, Panos M. Pardalos
Publication date: 1 June 2010
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2007.014169
90C11: Mixed integer programming
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
90B90: Case-oriented studies in operations research
Related Items
Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration, Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints, Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time, Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time, A robust optimization approach for the unrelated parallel machine scheduling problem
Uses Software