Integrated production and delivery scheduling with disjoint windows
From MaRDI portal
Publication:972326
DOI10.1016/j.dam.2009.12.010zbMath1186.90052OpenAlexW2063361697MaRDI QIDQ972326
Yumei Huo, Joseph Y.-T. Leung, Xin Wang
Publication date: 25 May 2010
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.dam.2009.12.010
single machineperishable goodsparallel and identical machinesfully polynomial time approximation schemesNP-hard and strongly NP-hard
Related Items
Integrated production and transportation on parallel batch machines to minimize total weighted delivery time ⋮ Integrated production and delivery on parallel batching machines ⋮ Coordinated scheduling of production and delivery with production window and delivery capacity constraints
Cites Work
- Unnamed Item
- Unnamed Item
- Batch scheduling of step deteriorating jobs
- Bin packing: Maximizing the number of pieces packed
- Coordinated supply chain management
- Integrated production/distribution planning in supply chains: An invited review
- Modeling and design of global logistics systems: a review of integrated strategic and tactical models and design algorithms
- Improving the complexities of approximation algorithms for optimization problems
- Approximating the Throughput of Multiple Machines in Real-Time Scheduling
- The Ordered Open-End Bin-Packing Problem
- A note on an open-end bin packing problem