Uncapacitated lot sizing with backlogging: the convex hull

From MaRDI portal
Revision as of 21:32, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1016115

DOI10.1007/s10107-007-0186-5zbMath1221.90068OpenAlexW2145130933MaRDI QIDQ1016115

Yves Pochet, Simge Küçükyavuz

Publication date: 4 May 2009

Published in: Mathematical Programming. Series A. Series B (Search for Journal in Brave)

Full work available at URL: http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.636.4196




Related Items (18)

Constant approximation algorithms for the one warehouse multiple retailers problem with backlog or lost-salesA Lagrangian relaxation-based method and models evaluation for multi-level lot sizing problems with backordersMixed integer programming in production planning with backlogging and setup carryover: modeling and algorithmsTwo-stage stochastic lot-sizing problem under cost uncertaintyStochastic lot-sizing problem with deterministic demands and Wagner-Whitin costsNew valid inequalities and formulations for the static joint chance-constrained lot-sizing problemRelaxations for two-level multi-item lot-sizing problemsA computational analysis of lower bounds for big bucket production planning problemsPath Cover and Path Pack Inequalities for the Capacitated Fixed-Charge Network Flow ProblemValid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setupsSingle-item dynamic lot-sizing problems: an updated surveyA polyhedral study of the static probabilistic lot-sizing problemMultiechelon Lot Sizing: New Complexities and InequalitiesValid inequalities for two-period relaxations of big-bucket lot-sizing problems: zero setup caseA relax-and-fix with fix-and-optimize heuristic applied to multi-level lot-sizing problemsPolyhedral analysis for the two-item uncapacitated lot-sizing problem with one-way substitutionAn optimization framework for solving capacitated multi-level lot-sizing problems with backloggingRobust formulations for economic lot-sizing problem with remanufacturing




Cites Work




This page was built for publication: Uncapacitated lot sizing with backlogging: the convex hull