On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date

From MaRDI portal
Revision as of 12:59, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1310010


DOI10.1016/0377-2217(93)90239-JzbMath0842.90060MaRDI QIDQ1310010

Chung-Yee Lee, Jeffrey W. Herrmann

Publication date: 6 August 1996

Published in: European Journal of Operational Research (Search for Journal in Brave)


90B35: Deterministic scheduling theory in operations research


Related Items

Parallel-Machine Scheduling to Minimize Flowtime, Holding, and Batch Delivery Costs, Machine scheduling with transportation considerations, Parallel machine scheduling with a common due window, An improved approximation algorithm for single machine scheduling with job delivery, Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval, Batch sizing and just-in-time scheduling with common due date, The coordination of scheduling and batch deliveries, Unbounded parallel batch scheduling with job delivery to minimize makespan, Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs, A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs, Scheduling with batch setup times and earliness-tardiness penalties, A survey of the state-of-the-art of common due date assignment and scheduling research, Single machine scheduling with assignable due dates, Machine scheduling with job delivery coordination, Simultaneous minimization of total completion time and total deviation of job completion times, Coordinating multi-location production and customer delivery, Single machine scheduling with release dates and job delivery to minimize the makespan, Logistics scheduling with batching and transportation, Integration of finished goods batch delivery into production scheduling via total tardiness minimization, SINGLE MACHINE SCHEDULING WITH JOB DELIVERY TO MINIMIZE MAKESPAN



Cites Work