Pure and mixed strategies for the EOQ repair and waste disposal problem
From MaRDI portal
Publication:1374391
DOI10.1007/BF01545511zbMath0889.90057MaRDI QIDQ1374391
Publication date: 4 December 1997
Published in: OR Spektrum (Search for Journal in Brave)
Related Items (18)
Exploring the effect of the first cycle on the economic production quantity repair and waste disposal model ⋮ Optimal control of production, remanufacturing and refurbishing activities in a finite planning horizon inventory system ⋮ Inventory decision-making models for a closed-loop supply chain system ⋮ Design of contract parameters in a closed-loop supply chain ⋮ Evaluating cost impacts on reverse logistics using an economic order quantity (EOQ) model with environmental and social considerations ⋮ A green supply chain model of vendor and buyer for remanufacturing ⋮ A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions ⋮ Optimal control of production and remanufacturing in a reverse logistics model with backlogging ⋮ An optimal returned policy for a reverse logistics inventory model with backorders ⋮ Production, remanufacturing and waste disposal models for the cases of pure and partial backordering ⋮ An optimal policy for recovery and procurement under multiple setups ⋮ Characteristics of the research on reverse logistics (1995–2005) ⋮ Remanufacturing planning for the reverse Wagner/Whitin models ⋮ Optimal ordering and production policy for a recoverable item inventory system with learning effect ⋮ Lot-sizing for a single-product recovery system with backordering ⋮ A production-repairing inventory model with fuzzy rough coefficients under inflation and time value of money ⋮ A review of mathematical inventory models for reverse logistics and the future of its modeling: an environmental perspective ⋮ A two storage production-repairing model with fuzzy defective rate and displayed inventory dependent demand
Cites Work
This page was built for publication: Pure and mixed strategies for the EOQ repair and waste disposal problem