Project scheduling. A research handbook.

From MaRDI portal
Revision as of 17:29, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1422056

zbMath1059.90068MaRDI QIDQ1422056

Willy S. Herroelen, Erik L. Demeulemeester

Publication date: 17 February 2004

Published in: International Series in Operations Research \& Management Science (Search for Journal in Brave)




Related Items (only showing first 100 items - show all)

New strategies for stochastic resource-constrained project schedulingA flow-based tabu search algorithm for the RCPSP with transfer timesA genetic algorithm for the robust resource leveling problemA classification of predictive-reactive project scheduling proceduresProactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilitiesA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsComplexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobsA float-path theory and its application to the time-cost tradeoff problemAn integer programming approach to the multimode resource-constrained multiproject scheduling problemA continuous time-cost tradeoff problem with multiple milestones and completely ordered jobsSolving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programmingScheduling resource-constrained projects with a flexible project structureAn approach using SAT solvers for the RCPSP with logical constraintsBi-objective resource-constrained project scheduling with robustness and makespan criteriaSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationExperimental investigation of heuristics for resource-constrained project scheduling: an updateModeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfersAn adaptive crashing policy for stochastic time-cost tradeoff problemsMultiobjective project portfolio selection with fuzzy constraintsA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesMathematical programming and financial objectives for scheduling projectsA multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problemMixed-integer linear programming for resource leveling problemsOptimizing the supply chain configuration for make-to-order manufacturingMulti-resource allocation in stochastic project schedulingThe total adjustment cost problem: applications, models, and solution algorithmsA preemptive bound for the resource constrained project scheduling problemProduction scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithmProject scheduling with finite or infinite number of activity processing modes -- a surveyNew concepts for activity float in resource-constrained project managementResource constraint scheduling with a fractional shared resourceDecentralised scheduling with confidentiality protectionResource constrained routing and scheduling: review and research prospectsResource leveling in a machine environmentA branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurementMulti-mode resource-constrained project scheduling using RCPSP and SAT solversSimplifying the nonlinear continuous time-cost tradeoff problemTropical optimization problems with application to project scheduling with minimum makespanHeuristics for a project management problem with incompatibility and assignment costsRobust execution strategies for project scheduling with unreliable resources and stochastic durationsTime and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centresAn exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relationsModelling and solving grid resource allocation problem with network resources for workflow applicationsA modified PSO algorithm for minimizing the total costs of resources in MRCPSPDismantling of nuclear power plants at optimal NPVTime slack-based techniques for robust project scheduling subject to resource uncertaintyBranch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurementStrong valid inequalities for the resource-constrained scheduling problem with uniform resource requirementsRobust proactive project scheduling model for the stochastic discrete time/cost trade-off problemA mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lagsA hybrid genetic algorithm for satellite image downlink scheduling problemOn the strength of time-indexed formulations for the resource-constrained project scheduling problemA practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lagsSolving the resource-constrained project scheduling problem using filter-and-fan approachA random key based genetic algorithm for the resource constrained project scheduling problemA heuristic procedure for solving the dynamic probabilistic project expediting problemResource tardiness weighted cost minimization in project schedulingTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesScheduling tests in automotive R\&D projectsAn efficient solution method to design the cost-minimizing platform portfolioOptimizing version release dates of research and development long-term processesA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemAn effective heuristic for project scheduling with resource availability costAnchored reactive and proactive solutions to the CPM-scheduling problemMaximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedureMoments and distribution of the net present value of a serial projectSingle-pass and approximate dynamic-programming algorithms for order acceptance and capacity planningEnhanced energetic reasoning-based lower bounds for the resource constrained project scheduling problemNew model and heuristics for safety stock placement in general acyclic supply chain networksAn integer programming formulation for the project scheduling problem with irregular time-cost tradeoffsNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingProject scheduling with irregular costs: complexity, approximability, and algorithmsExperimental evaluation of simulated annealing algorithms for the time-cost trade-off problemA new lower bound for the resource-constrained project scheduling problem with generalized precedence relationsTheoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problemsProject scheduling under uncertainty: survey and research potentialsA heuristic to schedule flexible job-shop in a glass factoryA path enumeration approach for the analysis of critical activities in fuzzy networksA decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durationsA model, heuristic procedure and decision support system for solving the movie shoot scheduling problemEfficient priority rules for the stochastic resource-constrained project scheduling problemMaximising the weighted number of activity execution modes in project planningA new path-based cutting plane approach for the discrete time-cost tradeoff problemDirect solution to constrained tropical optimization problems with application to project schedulingMinimizing total weighted late work in the resource-constrained project scheduling problemA new approach for quantitative risk analysisSimulated annealing for financing cost distribution based project payment scheduling from a joint perspectiveRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentDiscrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent resultsA heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer timesA parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relationsMinimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower boundA priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penaltiesOperating room planning and scheduling: a literature reviewMaximizing the net present value of a project under uncertaintySolving a comprehensive model for multiobjective project portfolio selectionActivity list representation for a generalization of the resource-constrained project scheduling problemBalancing assembly lines with variable parallel workplaces: problem definition and effective solution procedureComputing latest starting times of activities in interval-valued networks with minimal time lagsA priority-rule method for project scheduling with work-content constraints






This page was built for publication: Project scheduling. A research handbook.