Group technology approach to the open shop scheduling problem with batch setup times
From MaRDI portal
Publication:1577474
DOI10.1016/S0167-6377(00)00021-3zbMath0971.90034MaRDI QIDQ1577474
Publication date: 22 November 2000
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(00)00021-3
Related Items
Analysis of batched service time data using Gaussian and semi-parametric kernel models, A single machine carryover sequence-dependent group scheduling in PCB manufacturing, Group-scheduling problems in electronics manufacturing, A \(\frac 6 5\)-approximation algorithm for the two-machine routing open-shop problem on a two-node network, Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches, Four decades of research on the open-shop scheduling problem to minimize the makespan, A survey of scheduling problems with setup times or costs, The routing open-shop problem on a network: complexity and approximation, Two-machine open shop problem with a single server and set-up time considerations
Cites Work
- Unnamed Item
- Approximation algorithms for two-machine flow shop scheduling with batch setup times
- Two-machine shop scheduling problems with batch processing
- Two machine open shop scheduling problem with setup, processing and removal times separated
- Optimal two- and three-stage production schedules with setup times included
- Open Shop Scheduling to Minimize Finish Time