Fast approach to the optimal production/PM policy
From MaRDI portal
Publication:1591960
DOI10.1016/S0898-1221(00)00240-6zbMath1016.90005MaRDI QIDQ1591960
Shey-Heui Sheu, Chih-Hsiung Wang
Publication date: 14 January 2001
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
inventoryproduction systemspreventive maintenanceimperfect processoptimal inspection intervaleconomical manufacturing quality
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (8)
The impact of a free-repair warranty policy on EMQ model for imperfect production systems ⋮ Joint optimization of condition-based maintenance and production lot-sizing ⋮ Single-item dynamic lot-sizing problems: an updated survey ⋮ Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model ⋮ Joint determination of production run length and number of standbys in a deteriorating production process ⋮ Impact of inspection errors on the lot size problem ⋮ ECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIME ⋮ Optimal production run time for a deteriorating production system under an extended inspection policy
Cites Work
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Optimal Preventive Maintenance Policies for Repairable Systems
- Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
This page was built for publication: Fast approach to the optimal production/PM policy