An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
From MaRDI portal
Publication:1598772
DOI10.1016/S0377-2217(02)00077-2zbMath1001.90031MaRDI QIDQ1598772
Andrés Rodriguez-Gonzalez, David Alcaide, Joaquín Sicilia
Publication date: 28 May 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
90B35: Deterministic scheduling theory in operations research
90B36: Stochastic scheduling theory in operations research
Related Items
Uncertain flexible flow shop scheduling problem subject to breakdowns, Minimizing makespan for scheduling stochastic job shop with random breakdown, Risk measure of job shop scheduling with random machine breakdowns, A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
Cites Work
- Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities
- Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs
- Optimal two- and three-stage production schedules with setup times included
- A note on the two machine job shop with exponential processing times
- A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair
- Inequalities for stochastic flow shops and job shops
- Minimizing expected makespan in stochastic open shops
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item