Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost
From MaRDI portal
Publication:1699357
DOI10.1007/S40314-016-0305-0zbMath1381.93016OpenAlexW2281446338MaRDI QIDQ1699357
Publication date: 23 February 2018
Published in: Computational and Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40314-016-0305-0
Linear programming (90C05) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05)
Related Items (2)
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times ⋮ Group purchasing organization design: a clustering approach
Cites Work
- Inventory based bi-objective flow shop scheduling model and its hybrid genetic algorithm
- Single-machine batch scheduling minimizing weighted flow times and delivery costs
- A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem
- Formulating the single machine sequencing problem with release dates as a mixed integer program
- A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times
- A branch-and-price algorithm for an integrated production and inventory routing problem
- Single machine scheduling with batch deliveries
- On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date
- Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains
- A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs
- Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem
- Supply Chain Scheduling: Batching and Delivery
- Time-Indexed Formulations for Machine Scheduling Problems: Column Generation
This page was built for publication: Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost