Optimal production schedule in a single-supplier multi-manufacturer supply chain involving time delays in both levels
From MaRDI portal
Publication:1716998
DOI10.3934/jimo.2017080zbMath1412.49060OpenAlexW2759691223MaRDI QIDQ1716998
Chi Kin Chan, Yu Chung Eugene Lee, Kar Hung Wong, Heung-Wing Joseph Lee
Publication date: 5 February 2019
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2017080
optimal controlmultiple time delayssingle-supplier multimanufacturersupply chain problemtime delays in the production process
Newton-type methods (49M15) PDEs in connection with biology, chemistry and other natural sciences (35Q92) Finite element, Rayleigh-Ritz and Galerkin methods for initial value and initial-boundary value problems involving PDEs (65M60)
Related Items
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- A hybrid time-scaling transformation for time-delay optimal control problems
- A robust implementation of a sequential quadratic programming algorithm with successive error restoration
- Visual MISER: an efficient user-friendly visual program for solving optimal control problems
- Optimal control computation for linear time-lag systems with linear terminal constraints
- Optimal control computation for nonlinear time-lag systems
- Optimal feedback production for a single-echelon supply chain
- Nonlinearly constrained time-delayed optimal control problems
- Measuring and avoiding the bullwhip effect: A control theoretic approach
- Control parametrization method for free planning time optimal control problems with time-delayed arguments.
- Control theory concepts in production and inventory control
- Modelling the dynamics of supply chains
- Synthesis of control policies for cascaded production-inventory systems
- The stability of supply chains
- Modal control of production-inventory systems
- On the Application of Servomechanism Theory in the Study of Production Control