Minimizing the makespan on a single machine subject to modular setups
From MaRDI portal
Publication:2124915
DOI10.1007/s10951-021-00704-8zbMath1486.90089OpenAlexW3200193390MaRDI QIDQ2124915
Dirk Briskorn, Nils Boysen, Konrad Stephan
Publication date: 11 April 2022
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-021-00704-8
Cites Work
- Unnamed Item
- The third comprehensive survey on scheduling problems with setup times/costs
- A survey on single crane scheduling in automated storage/retrieval systems
- Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times
- Single-machine group scheduling with general deterioration and learning effects
- Group scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machine
- Crane scheduling in railway yards: an analysis of computational complexity
- Classifying and modeling setups and cleanings in lot sizing and scheduling
- Single-machine ready times scheduling with group technology and proportional linear deterioration
- A survey of scheduling problems with setup times or costs
- Single-machine scheduling problems with past-sequence-dependent setup times
- Algorithmic Aspects of Pyramidal Tours with Restricted Jump-Backs
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Well-Solvable Special Cases of the Traveling Salesman Problem: A Survey
- An improved approximation algorithm for ATSP
- A constant-factor approximation algorithm for the asymmetric traveling salesman problem
This page was built for publication: Minimizing the makespan on a single machine subject to modular setups