A power penalty method for the general traffic assignment problem with elastic demand

From MaRDI portal
Revision as of 23:01, 2 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:2438418

DOI10.3934/JIMO.2014.10.1019zbMath1292.90295OpenAlexW2005212146MaRDI QIDQ2438418

Ming Chen, Chong-Chao Huang

Publication date: 11 March 2014

Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.3934/jimo.2014.10.1019




Related Items (3)




Cites Work




This page was built for publication: A power penalty method for the general traffic assignment problem with elastic demand