On \(M/G/1\) system under \(NT\) policies with breakdowns, startup and closedown

From MaRDI portal
Revision as of 02:53, 3 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:2504402

DOI10.1016/j.apm.2005.03.022zbMath1163.90426OpenAlexW1985698408MaRDI QIDQ2504402

Jau-Chuan Ke

Publication date: 25 September 2006

Published in: Applied Mathematical Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.apm.2005.03.022




Related Items (20)

Cost optimization of a repairable M/G/1 queue with a randomized policy and single vacationThe \(N\)-policy for an unreliable server with delaying repair and two phases of serviceA single server queueing system with two phases of service subject to server breakdown and Bernoulli vacationEquilibrium threshold strategies in observable queueing systems with setup/closedown timesRandom \(N\)-policy Geo/G/1 queue with startup and closedown timesAnalysis of a queueing system in random environment with an unreliable server and geometric abandonmentsAnalysis of batch arrival queue with randomized vacation policy and an un-reliable serverThe optimal control of an unreliable server queue with two phases of service and Bernoulli vacation scheduleUnnamed Item\(\mathrm{M}^{[X}/\mathrm{G}_1\), \(G_2/1\) with setup time, Bernoulli vacation, break down, and delayed repair] ⋮ Queues with interruptions: a surveyA batch arrival queue under randomised multi-vacation policy with unreliable server and repairAnalysis of MAP/M/1 queue with working breakdownsThe M/G/1 queue with disasters and working breakdownsAn \(M/G/1\) queue with two phases of service subject to the server breakdown and delayed repairThe randomized vacation policy for a batch arrival queueAn \(M^X/G/1\) unreliable retrial queue with two phases of service and Bernoulli admission mechanismA Discrete-Time Single-Server Queueing System Under Multiple Vacations and Setup-Closedown TimesEntropy maximization andNTvacation M/G/1 model with a startup and unreliable server: comparative analysis on the first two moments of system sizeA quorum queueing system with an unreliable server



Cites Work




This page was built for publication: On \(M/G/1\) system under \(NT\) policies with breakdowns, startup and closedown