Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency
Publication:2988474
DOI10.3233/IFS-141491zbMath1361.90023OpenAlexW1860343168MaRDI QIDQ2988474
Aijun Liu, Yang Yu, Guodong Yu, Xi Zhao
Publication date: 19 May 2017
Published in: Journal of Intelligent & Fuzzy Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3233/ifs-141491
algorithmmulti-objective optimizationdynamic schedulingfuzzinessemergencyproduct collaborative design scheduling problem
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- A constraint-based approach for the shift design personnel task scheduling problem with equity
- Algorithms for large scale shift minimisation personnel task scheduling problems
- Fuzzy job-shop scheduling problems: a review
- Scheduling of design projects with uncertain number of iterations
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
- A simulation approach for evaluation and improvement of organisational planning in collaborative product development projects
- The Statistical Mechanics of Complex Product Development: Empirical and Analytical Results
- A genetic algorithm for flexible job shop scheduling with fuzzy processing time
- Scheduling to minimize product design time using a genetic algorithm
- Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts
This page was built for publication: Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency