Number-dependent replacement model with random lead-time for systems under maintenance continuously
From MaRDI portal
Publication:3006187
DOI10.1080/00207720802011233zbMath1217.90081OpenAlexW2009712218MaRDI QIDQ3006187
Publication date: 10 June 2011
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207720802011233
Related Items (2)
Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time ⋮ A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul
Cites Work
- Unnamed Item
- Extended optimal age-replacement policy with minimal repair of a system subject to shocks
- Extended optimal replacement model with random minimal repair costs
- Analysis of a system with minimal repair and its application to replacement policy
- A generalized model for determining optimal number of minimal repairs before replacement
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- An extended optimal replacement model of systems subject to shocks
- A Modified Block Replacement with Two Variables
- Optimum Preventive Maintenance Policies
- Periodic replacement when minimal repair costs vary with time
- Optimal Number of Failures before Replacement Time
- Optimum Replacement of a System Subject to Shocks
- Age-dependent minimal repair
- An imperfect maintenance model with block replacements
- Optimal Number of Minimal Repairs before Replacement
- The Age Replacement Problem with Minimal Repair and Random Repair Costs
- Age Replacement with Leadtime
- Optimal number of minor failures before replacement
- Optimum replacement policies with delay
- Optimal number of minimal repairs before replacement of a system subject to shocks
- A modified block replacement policy with two variables and general random minimal repair cost
- Generalized spare ordering policies with allowable inventory time
This page was built for publication: Number-dependent replacement model with random lead-time for systems under maintenance continuously