Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria
From MaRDI portal
Publication:3156754
DOI10.1002/nav.20024zbMath1075.90035OpenAlexW2054156125MaRDI QIDQ3156754
Xian Zhou, Xiaoqian Sun, Xiaoqiang Cai
Publication date: 11 January 2005
Published in: Naval Research Logistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20024
stochastic schedulingweighted number of tardy jobsmachine breakdownspreemptive-repeatdiscounted rewarddelayed deliveryweighted squared flowtime
Characteristic functions; other transforms (60E10) Reliability, availability, maintenance, inspection in operations research (90B25) Stochastic scheduling theory in operations research (90B36)
Related Items
Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns ⋮ A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines ⋮ Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns ⋮ Optimal rules for single machine scheduling with stochastic breakdowns ⋮ Single machine stochastic JIT scheduling problem subject to machine breakdowns ⋮ Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model ⋮ Scheduling deteriorating jobs on a single machine subject to breakdowns ⋮ The effect of service time variability on maximum queue lengths in MX/G/1 queues ⋮ Stochastic machine scheduling to minimize waiting time related objectives with emergency jobs
Cites Work