Scheduling problem in a two-machine flow line with theN-step prior-job-dependent set-up times
From MaRDI portal
Publication:3153829
DOI10.1080/002077201300029764zbMath1006.90046OpenAlexW2167262185MaRDI QIDQ3153829
Publication date: 12 March 2003
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002077201300029764
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
A survey of scheduling problems with setup times or costs ⋮ Using genetic algorithm for lot sizing and scheduling problem with arbitrary job volumes and distinct job due date considerations ⋮ Modelling adaptive multi-agent manufacturing control with discrete event system formalism
This page was built for publication: Scheduling problem in a two-machine flow line with theN-step prior-job-dependent set-up times