Scheduling jobs with controllable processing times as an optimal control problem
From MaRDI portal
Publication:3312009
DOI10.1080/00207178408933210zbMath0529.90058OpenAlexW2087725838MaRDI QIDQ3312009
Eugeniusz Nowicki, Stanisław Zdrzałka
Publication date: 1984
Published in: International Journal of Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207178408933210
optimal schedulecompletion timeweighted flow timecontrollable processing timessingle processorsimultaneous processingprocessing time control by resource allocation
Related Items (3)
Batch scheduling of identical jobs with controllable processing times ⋮ Pre-emptive scheduling problems with controllable processing times ⋮ Scheduling two agents with controllable processing times
Cites Work
- Project Scheduling with Discrete and Continuous Resources
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- Optimal control of a complex of independent operations
- Controlled jump process models for stochastic scheduling problems
- A hamiltonian approach to optimal stochastic resource allocation
This page was built for publication: Scheduling jobs with controllable processing times as an optimal control problem