Routing Printed Circuit Cards Through an Assembly Cell
From MaRDI portal
Publication:4006342
DOI10.1287/opre.39.6.992zbMath0825.90516OpenAlexW2156635225MaRDI QIDQ4006342
Leon F. McGinnis, Craig A. Tovey, Christopher B. Lofgren
Publication date: 26 September 1992
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.39.6.992
Programming involving graphs or networks (90C35) Abstract computational complexity for mathematical programming problems (90C60) Transportation, logistics and supply chain management (90B06) Production models (90B30) Computational methods for problems pertaining to operations research and mathematical programming (90-08) General theory of computer systems (68M01)
Related Items
A planning and scheduling model for onsertion in printed circuit board assembly ⋮ A note on the precedence-constrained class sequencing problem ⋮ An exact dynamic programming algorithm for the precedence-constrained class sequencing problem ⋮ Production planning problems in printed circuit board assembly ⋮ The assembly of printed circuit boards: A case with multiple machines and multiple board types ⋮ Combinatorial optimization models for production scheduling in automated manufacturing systems ⋮ Optimization of printed circuit board manufacturing: Integrated modeling and algorithms